Site Details
- Address
- 800-900 N Boundary Patrol Rd., New Boston, TX 75570
- Coordinates
-
33.46047,
-94.34975
Located inside TexAmericas Center with on-site rail access and heavy industrial zoning, S.T.A.R. Site is designed for industrial-scale users who need strong freight connections and regulatory advantages. The site sits near I-30 (about 7.6 miles) and has transmission power, natural gas, and water nearby, plus rail access on site.
This undeveloped, subdividable 101-acre parcel offers Foreign Trade Zone status, New Market Tax Credit and Opportunity Zone incentives with PILOT options, making it attractive for manufacturing, distribution, and heavy industrial operations. Adjoining land and park support position the site for rapid development and scalable projects.
-
Complex Name
-
TexAmericas Center
Land
-
Developable Land
-
101
Acres
-
Classification
-
Greenfield
Improvements
-
Utility Infrastructure
-
No
-
Transportation Infrastructure
-
No
Expansion
-
On-Site Expansion
-
Opportunity
Zoning and Land Use
Environmental
-
Soil Characteristics
-
Cohesive and Permeable
-
Soil Type
-
['Clay', 'Silt', 'Sand', 'Loam']
-
Other Water Area
-
0.0
acres
-
Environmental Phase I Study
-
Completed
-
Drainage & Retention System
-
No
Easements
- Telecommunication Easement
- No
Roads
| Name |
Type |
Distance |
| US 59 |
Highway |
15.3 miles |
| LOOP 151 |
Highway |
18.6 miles |
| AR 151 |
Highway |
26.6 miles |
| I 30 |
Interstate Highway |
7.6 miles |
| I 369 |
Interstate Highway |
15.3 miles |
| I 49 |
Interstate Highway |
22.2 miles |
Airports
| Name |
Code |
Distance |
| Hall-Miller Muni |
General Aviation Airport |
41.3 miles |
| Greater Morris County |
General Aviation Airport |
41.7 miles |
| Clarksville/Red River Cty-J D Trissell Fld |
General Aviation Airport |
45.5 miles |
Rail
| Railroad |
Line |
Distance |
| Union Pacific Railroad |
Up Pine Bluff Subdivision |
8.4 miles |
| Kiamichi Railroad |
Kiamichi Railroad |
16.2 miles |
| Cpkc |
Cpkc Shreveport Subdivision |
16.9 miles |
Intermodal
Electrical
-
Closest Line Type
-
Transmission Lines
-
Dual Feed Electricity
-
Yes
-
Green Energy
-
Not Available
| Substation |
Voltage |
Distance |
| Southwestern Electric Power Company Unknown |
138.0 kV |
9.8 miles |
| American Electric Power Northwest Texarkana Substation |
345.0 kV / 138.0 kV |
10.1 miles |
| Power Line |
Voltage |
Distance |
| Unknown |
138 Kv |
1.4 miles |
| American Electric Power |
345 Kv |
3.0 miles |
| Southwestern Electric Power Company |
138 Kv |
3.5 miles |
Natural Gas
-
Natural Gas Capacity
-
25 psi
MCFH
Water
Wastewater
-
Wastewater Service
-
Municipal
Telecommunications
-
Data Center Infrastructure
-
Available
Pipelines
| Owner |
Commodity |
Distance |
| Enable Gas Transmission, LLC |
Gas |
0.3 miles |
| Enable Gas Transmission, LLC |
Gas |
1.2 miles |
| Enable Gas Transmission, LLC |
Gas |
1.3 miles |
Taxes